GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System

Product Details
Customization: Available
After-sales Service: 360days
Warranty: 360days
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

3D Software Design
The supplier provides 3D software design services
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
Fast Delivery
The supplier can deliver the goods within 15 days
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (14)
  • GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
  • GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
  • GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
  • GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
  • GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
Find Similar Products
  • Overview
  • Company Profile
  • QC & Packaging & Shipping
  • Sales map
  • Certifications
  • FAQ
Overview

Basic Info.

Max Diameter of Workpiece
<500mm
Mass Scope of Workpiece
10000kg
Type
Static Hydrostatic Testing
Maxcapacity
<1000KN
Accuracy Grade
0.5
Load Way
Electronic Load
Loading Method
Static Load
Display
Digital
Control
Computer Control
Weight
100-500Kg
Power Source
AC380V
Oil Cylinder Position
None
Transport Package
in Bulk
Specification
DN50-DN500
Trademark
Vidatech
Origin
China

Product Description

GRP Pipe GRE Pipe HDB/PDB Long-Term Testing Machine


HDB Long-Term Static Hydrostatic Test Systems for GRP pipe, GRE pipe .

General description:

One of the main data of GRP pipes design is based on the materials of inner layer and structure layer's pressure performance during different time. Long-term performance of GRP pipe, under the condition of meeting certain requirements, can ensure safe and reliable using within the designed lifetime Vidatech introduce HDB testing equipment production technology and measurements techniques, which used in AMIANTIT, FPI etc. According to ASTM standard, within 10000 hours, with maximum 18pcs standard specimens, then the testing result evaluated and obtain the value of 50 years.

Testing equipment consists of by:

- Mobile pressure device ;
- temperature control heating enclosures ;
- computer control devices for process control , monitoring, reporting


Standard:

Test procedure according to DIN BS EN 1447, ASTM D 2992 and ASTM D 1598

Advantage:

•Several tests to proceed at the same time. The user can define the pressure, temperature and testing time, the testing and monitoring is automatically and continuously. Each specific piping product is under independent environmental conditions, not be affected each others. After testing finish, the equipment could be detected automatically. Each specimen failure measured by independent failure alarm device.
•The monitoring can be done from the Laboratory's computer, or from the site's control units equipped on the enclosure. The reports generated are compatible with Windows office.
•Results of Each test specimen are integrated and displayed on a log-log graph, easy for analysis.
•Test procedure according to DIN BS EN 1447, ASTM D 2992 and ASTM D 1598




 
Company Profile

 

Products and Services


Vidatech Composite, as designer and manufacturer of automated machine and know-how based on filament winding technology. Since 2008, Vidatech integrated with our own-designed PLC control system, and delivered machines and service to global customers.

1. Multi Spindles Multi Axis Automatic CNC control Filament Winding Machine
2. GRP Pipe Filament Winding Production Line -Continuous and Discontinuous
3.  FRP Tank Filament Winding Machine
4.  GRP Pipe/Tank Mandrels (Molds) 
5. 
Production Know-How for GRP pipes and tanks etc.
6. Customized CNC Machine for Composite cylinders,tanks, pipes.
 


GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
 
GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
QC & Packaging & Shipping


                                       Quality Control                             packaging                          shipping

GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
Sales map


GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System
 
Certifications
 

GRP Pipe Gre Pipe Hdb Pdb Long-Terms Testing System

 
FAQ

Q1. What about the payment way?
A1. By TT, L/C at sight or trade assurance. 30% down payment should be paid after contract is valid, 70% balance should be paid before shipment.

Q2. Installation and stuff training available from you?
A2. Yes, we have rich engineers around the world which can send to your factory and train your workers. Also we can online guide your members.

Q3. How long is the guarantee?
A3. We offer you high quality machines with 12 months guarantee and reply you as soon as possible within 6 hours.

Q4. If the machine some parts is broken one day, how can we get help from you?
A4. We will send you spare parts free of charge If they are in warranty, not including easy-broken parts. For easy-broken parts, we will only charge a cost fee.

Q5.How does your factory do regarding quality control?
A5.We have passed the IS09001:2000 Quality Management System and CE certificate and we have a special QC department in charge of products' quality. If you also need other certificates, we also can help to apply.

Q6. What is your packaging?
A6. Our conventional packaging is: After doing the anti-rust treatment, wrap the plastic film around the machine and then fix the machine on the wooden bracket.

Q7. How can we check the machines before delivery?
A7. We can provide online checking when testing the machine on site. We will take and prepare detailed testing videos for your checking before the delivery. We accept third-party testing. Except above points,we will provide detailed testing report.

 






 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier